Published 2026-09-08 · By Chen Guoqiang
Choosing armature production equipment for a new motor plant in Southeast Asia
Single machines or a linked line, what to put in the acceptance test, and which questions to ask a Chinese equipment supplier before signing.
Single machines or a linked line
Stand-alone machines are easier to commission and let you keep existing stations. A linked line reduces operators and work-in-progress but needs the layout fixed before the machines are built. Most plants start a new product on stand-alone machines and link them once volume is stable.
What to put in the FAT
- Run on your own cores, commutators and wire, not the supplier's samples
- Agreed quantity at agreed takt with no manual intervention
- Measured quality figures (runout, resistance, hi-pot) on a sample from the run
- Changeover to a second model if you will run more than one
Questions to ask before signing
- Which PLC and servo brands are used, and are they serviceable in your country?
- Who installs, for how many days, and what does the customer provide on site?
- What is the spare parts list and stock policy for the first two years?
- Is remote support included, and how is it accessed?